All-in-One 5G Converged Terminal: The Preferred Solution for State Grid Fujian PV Projects
Project Background: Technical Challenges Under Strict Grid Connection Requirements
In 2025, State Grid Fujian Electric Power issued a letter setting clear requirements for commercial and industrial distributed PV projects. The grid connection plan states that dispatch automation products (PV four capabilities) must meet the following functional requirements:
Dispatch automation: low-voltage 0.4 kV connection to the State Grid requires a telecontrol system for group dispatch and group control
Security encryption: mandatory deployment of vertical encryption devices using the SM2 algorithm
AGC/AVC control: respond to dispatch power commands within 50 ms and distribute them automatically to on-site equipment
Independent centralized control: the owner’s monitoring channel must be physically isolated from dispatch
Four-in-One Solution

1. Integrated Dispatch Communication and Security Encryption
✅ Built-in encryption chip: an integrated vertical encryption module with domestic SM2 encryption that connects seamlessly to master station encryption equipment from vendors such as Kedong and NARI

2. Millisecond-Level AGC/AVC Group Control
✅ 50 ms response: dispatch commands are distributed automatically to inverter groups

3. 5G Wireless Deployment Preferred
✅ Industrial-grade reliability: wide-temperature operation from −40 °C to 75 °C replaces fiber cabling

4. Dual-Channel Physical Isolation
✅ Dispatch data: sent directly to the State Grid distribution network master station over a private 5G network
✅ Owner centralized control: an independent channel that is 100% compliant with security requirements
Proven on a State Grid Project: Full Process Delivered
Project Implementation Timeline
Day 1: the terminal connects to the inverter over RS-485 and dispatch parameters are configured remotely
Day 3: the vertical encryption module passes the security review
Day 7: AGC control testing reaches a response time of 32 ms
“The conventional approach needed three devices. Now one terminal meets every dispatch requirement, and the commissioning period is 70% shorter.”

Dispatch network architecture
Core Advantages: Less Hassle, Less Time, Less Cost
⚡ Consolidation: one unit replaces a telecontrol unit, an encryption gateway and an AGC substation
⚡ Zero commissioning: any electrician can wire it up and run it
⚡ Full protocol compatibility: a built-in library of 300+ protocols, supporting MODBUS, 104, 61850 and more

Product interfaces
Upgrade your PV plant grid connection solution today.
Get the State Grid PV Grid Connection Case Handbook plus a free network design consultation.